Public Hearing Scheduled - November 16th, 2026 at 7:00pm via Zoom
Project Summary
The SLRD received a development application for a proposed campground on a 7.27 hectare parcel of land adjacent to the existing Porteau Cove Provincial Park. Existing site uses include aggregate extraction (gravel mine). Remediation works to stabilize the slopes for development are completed under the existing Mine Permit.
The application proposes up to 73 campsites, an outdoor amenity space, the inclusion of a commercial assembly use for events, and an amenity/commercial building which includes employee housing. Visit our Public Webmap to view the location of this parcel.
The current Rural Resource 3 (RR3) zoning and Resource Management OCP designation does not provide for the provide for campground use, thus the need for a Zoning and OCP amendment application. The Zoning and OCP Amendment Applications are being processed concurrently.
Current Status
The Amendment Bylaws were read for a second time at the March 25, 2026, SLRD Board meeting, and staff were directed to schedule a public hearing.
Public Hearing
This Public Hearing has been scheduled for November 16th, 2026 at 7:00pm. Please view the Notice of Public Hearing for meeting details. The Public Hearing will be held virtually via Zoom.
Written comments will be accepted up until the close of the Public Hearing on November 16th.
SLRD Campground Bylaw and Campground Permit
The proposed campground is subject to the requirements of the SLRD Campground Bylaw, including standards related to parking, internal circulation, landscaping, wildfire protection, waste management, lighting, and traffic management.
At the direction of the SLRD Board, the applicant submitted a Campground Permit application in advance of the public hearing process. SLRD staff have reviewed the application for compliance with the SLRD Campground Bylaw and have prepared a draft Campground Permit. Should the proposed amending bylaws receive third reading, the Campground Permit would be issued by the Manager of Planning and Development prior to bylaw adoption.
Other Regulations and Requirements
A number of SLRD policies and bylaws apply to this application, including, but not limited to:
- SLRD Campground Bylaw
- SLRD Wildlife Attractant Bylaw
- SLRD Wildfire Protections (Development Permit Area and Wildfire Landscaping Management Bylaw)
Staff Reports
First Reading Report - September 13, 2023, EAD/September 27, 2023 SLRD Board Meeting
Second Reading Report - March 25, 2026, Board Meeting [PDF/1.1MB]
Draft Amendment Bylaws and Draft Campground Permit
Draft Zoning Amendment Bylaw 1830-2023 [PDF/144KB]
Draft OCP Amendment Bylaw 1823-2023 [PDF/165KB]
Zoning and OCP Amendment Application Materials
Professional Reports
- Geotechnical Report
- Technical Letter - Remediation Slope Stability
- Traffic Impact Assessment
- Civil Engineering Report
- Initial Environmental Review
- Water Treatment Facility - Feasibility Study
- Technical Water Supply Assessment